Breton Landfill Expansion

Project: Large-Scale landfill Liner Installation – 22,000 m²

Location: Alberta, Canada

Scope of Work

Canadian Erosion & Containment (CEC) delivered a comprehensive liner installation solution for a major industrial containment project, covering 22,000 m². The work included:

• GCL Liner Installation

Installed Geosynthetic Clay Liner (GCL) for superior hydraulic barrier performance and long-term seepage control.

• HDPE Liner Installation

Applied High-Density Polyethylene (HDPE) liner for exceptional chemical resistance and structural integrity, ensuring compliance with environmental regulations.

• Geocomposite Liner Installation

Integrated Geocomposite liners to enhance drainage and filtration, optimizing site sustainability and performance.

Key Highlights

• Large-scale installation completed on time and within budget

• Advanced containment solutions for oil & gas and industrial applications

• Commitment to environmental protection and regulatory compliance

Skills

Posted on

June 19, 2026