CEC Projects Featured Feb 10, 2024 Coast Gas Link Pipeline Heli Hydroseeding Feb 10, 2024 Feb 10, 2024 May 12, 2023 ProFlex Installed by CEC Supplied by Profile Products May 12, 2023 May 12, 2023 May 12, 2023 McKinnon Flats Road Construction Hydromulch May 12, 2023 May 12, 2023 May 12, 2023 Remington Frontier Pond Flexamat slope project May 12, 2023 May 12, 2023 May 12, 2023 CEC Supplied and Installation Over 200,000 m² of TRM for the High River Dike Project May 12, 2023 May 12, 2023 May 12, 2023 Supply and installed 2600/m2 of G2 Cable Concrete for the Livingstone subdivision Development Project May 12, 2023 May 12, 2023 May 12, 2023 Site Reclamation on the Westmoreland Coal Mine site using Proganic and Promatrix. 20 ha of Both products were sprayed at 3940kg ha. May 12, 2023 May 12, 2023 May 12, 2023 Supply and Install 10ha of Proganic and Promatrix on 100% berms. For Alberta Oil producer May 12, 2023 May 12, 2023 May 7, 2023 West Dried Meat Landfill supply and install May 7, 2023 May 7, 2023 May 7, 2023 Secure Energy Slope ProtectionShoreline Restoration for Sask Power May 7, 2023 May 7, 2023 May 7, 2023 Didsbury Landfill HDPE liner May 7, 2023 May 7, 2023 May 7, 2023 Central Landfill Expansion HDPE Pipe Fusion May 7, 2023 May 7, 2023 May 7, 2023 Youngstown Cell D HDPE Liner system May 7, 2023 May 7, 2023 May 7, 2023 Calgary Ring Road project Bridge abutments 30mil liner and double layer textile installation May 7, 2023 May 7, 2023 May 7, 2023 Haskanye Subdivision Gabion wall installation May 7, 2023 May 7, 2023 May 7, 2023 450,000 m2 ECOANCHOR 12 months application May 7, 2023 May 7, 2023 May 7, 2023 32,000/m2 NS GCL liner May 7, 2023 May 7, 2023 May 7, 2023 Plains Midstream – Waterton Crossing Hydroseed May 7, 2023 May 7, 2023 May 7, 2023 Banaster line 3 May 7, 2023 May 7, 2023 May 7, 2023 Liner 3 Site Energy 37km Spread 9 May 7, 2023 May 7, 2023 May 7, 2023 Vegetated MSE wall Sierra Slope May 7, 2023 May 7, 2023 May 7, 2023 Supply & Install Bituminous Geomembrane Liner May 7, 2023 May 7, 2023 May 7, 2023 Hard Armor – ArmorFlex 70T – Install May 7, 2023 May 7, 2023 May 7, 2023 Coastal Gas link Hydromulching project 1.2 million m2 of Flexterra May 7, 2023 May 7, 2023 May 7, 2023 CEC supplied and backfilled 10,740/m3 Des 2 Crush,175/m3 May 7, 2023 May 7, 2023 May 7, 2023 2500/m3 clay backfill May 7, 2023 May 7, 2023 May 7, 2023 Cec supplied and installed 1,500/m2 of Terrawall May 7, 2023 May 7, 2023 May 7, 2023 CEC Supply and Install 1800/m2 Load n Lock MSE Wall Face May 7, 2023 May 7, 2023 May 7, 2023 Cranston Riverstone project precast panel wall system with 56 soldier piles 880mm May 7, 2023 May 7, 2023 May 7, 2023 Terrasteep 90 MSE Wall System May 7, 2023 May 7, 2023